duke energy transformer pad specifications

Your file is uploaded and ready to be published. Wall mount current transformer cabinets are available in several sizes and configurations ranging from 400 amps to 1200 amps. Energy's experience, are frequently applicable to utility scale solar farms. Weight: Downloads. Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software. PDF: 9696-PIT-Divider-2.pdf. SERC Reliability Corporation (SERC)Guideline: Facility Interconnection Requirements Guidelines (SERC regional supplement to the NERC Reliability Standard FAC-001). 0000009766 00000 n endstream When a transformer is installed in a vault, the customer shall install a 1" metering conduit from the secondary compartment of the pit pad to the metering location as specified by Duke Energy. 1998-2023 Entergy Corporation, All Rights Reserved. Additionally, the SERC Supplement, Key Reference #2 is applicable to both the FERC functional entity Transmission Owner and Applicable Generator Owner. /Size 98 /Prev 286620 Transmission consists of lines and facilities operated at or above the transmission voltage level of 69 kV (69,000 Volts). startxref Overview From small stabilizing pads to large transformer foundations, Oldcaslte Infrastructure equipment pads are durable and convenient foundations for your equipment needs. View . Performing this action will revert the following features to their default settings: Hooray! RH0pm-o/O(;M?~4ytU_/~uKgoap~XjU>]giaknxl6ZO/Fnij~{?>o*x H324A(C|fgg|^wT{ZfaDe=i5P {{\C Y[0YQ~ T,/T2_*p(|T 1. 0000016773 00000 n <> 327703 Transformer Pad 40x45x4 Single Phase (25-167KVA), 327704 Transformer Pad 56x50x4 Single Phase, 327707Transformer Pad 75x60x7 3 Phase (75-500KVA), 327712 Transformer Pad 87x82x7 3 Phase (750-2500KVA), 2001315 Transformer Pad 40x45x4 1 Phase (25-50KVA), 2001316 Transformer Pad 52x44x4 1 Phase (75-250KVA), 2001317 Transformer Pad 66 x 74 x 4 3 Phase URD Transformer, 2001318 Transformer Pad 60 x 50 x 30 3 Phase 200 AMP DFSG, 2001319 Transformer Pad 75 x 86 x 36 3 Phase 600 AMP SG, 2001323 Transformer Pad 96 x 96 x 6 3 Phase URD Transformer, 2001324 Transformer Pad 96 x 76 x 6 3 Phase URD Transformer, 2001325 Transformer Pad 60 x 39 x 4 200A/600A SG Pad, 2117010 Transformer Pad 100 x 96 x 6 3 Phase URD transformer, Home Barrier must extend to the walls of the pit, from the top of the pad to the bottom of the pit and its top level must be level with the top of pad. Specs & Guides Material: Concrete. Duke Energy is a sustainable electric and gas company whose regulated operations serve 7.2 million U.S. customers in the Southeast and Midwest. Do Not Sell Or Share My Personal Information, Offers a simple rugged design for a strong foundation. << /Linearized 1 /L 287793 /H [ 1473 256 ] /O 56 /E 17898 /N 10 /T 286629 >> <>>>/CropBox[0 0 612 792]/Rotate 0/VP[<>]/Subtype/RL/A[<>]/Type/Measure/R( )/D[<>]>>/Type/Viewport>>]/MediaBox[0 0 612 792]/Parent 49 0 R/Type/Page/Contents[62 0 R 61 0 R 60 0 R 59 0 R 58 0 R 57 0 R 68 0 R 67 0 R]>> 0000017815 00000 n We will reach out soon to confirm order details, delivery details and price. Call for Bulk Pricing. Do Not Sell Or Share My Personal Information, Offers a simple rugged design for a strong foundation. From small stabilizing pads to large transformer foundations, Oldcaslte Infrastructure equipment pads are durable and convenient foundations for your equipment needs. . Hours. (Refer to the Padmount Clearance Standard for minimum distances from sides and back of concrete. <>stream D09AJM02.CDR. List Price About Our Cabinets EMI, Inc. manufactures current transformer cabinets that meet the specific requirements of many utilities. <> Any size and location to fit your equipment needs. Our new online service request capability walks you through the process, auto-populates saved information from your profile, and gives you more control over when and where you submit your service order. This will ensure that the proper dimensions are used for the concrete transformer foundation. EXPECTED REVISIONS NERC Standards and SERC Guidelines are periodically reviewed and updated or retired. Small Flat Pad and Pit Pad- Mecklenburg County Only See Note 2 82 Welded Wire Fabric (6 x 6) W2 x W2 Maintain 2 cover from the top of the concrete. 0000016891 00000 n 4905 Stough Road Concord, NC Phone (704) 788-4050. Generation facilities, transmission facilities, and electric end-user facilities connected to Entergy within the SERC Region shall be required to remain in compliance with all applicable NERC Reliability Standards and SERC Supplements. Customer shall inform Duke Energy of the number, size, and type of secondary conductors that will be installed. Listed by: mwrublewski. Read about how we use cookies and how you can control them by visiting our Cookie Statement. If you continue to use this site, you consent to the use of cookies. Duke Energy. it windows (first story) 10 10 of window, door, etc. While browsing our products, select Add to Quote Generator to quickly get an estimate for everything you need. The Duke Energy Progress Distribution Construction Standards consist of the following . %PDF-1.3 % Custom sized pads for all transformer specifications. Languages English Age Rating 4+ Copyright 2022 Duke Energy Corporation Price Free App Support Spec. Access to the Contractor Portal requires username and . Entergy will maintain this website as needed. clearance from curb to transformer pad of eight (8) feet, to accommodate (clear) the rear overhang of a truck trailer. Generally, the SMALL pad is used for transformers rated 300 KVA and below, and the LARGE pad is used for transformers rated 500 KVA and above. 48x66 Secondary Bus Pad - Duke Energy. 0000013715 00000 n Specs & Guides Material: Concrete. From small stabilizing pads to large transformer foundations, Oldcaslte Infrastructure equipment pads are durable and convenient foundations for your equipment needs. iPod touch Requires iOS 14.0 or later. 5) Barrier required for pit pad only. 0000004177 00000 n These standards also require those entities seeking to add facilities or connect to the interconnected transmission system to comply with the following documents and standards: Duke Energy Midwest Facility Connection Requirements document; the NERC Reliability Standards, RF Why Trenwa x[rGCL!r_e-mvv4%(X$k~ 'CrfUn>^(-t5{3|Zm])F9_rFMp. Employment Opportunities endobj M-F 7:00-4:00. Special metering and grounding considerations may need to be considered for each of these deliveries. Access to documents that are deemed confidential is available to parties with a need to know who agree to abide by and sign appropriate confidentiality agreements. 0000016206 00000 n Distances are from the pad or transformer whichever is closer to the building or opening. 0000006958 00000 n Product Availability. NOTES: 1. Flat Pad and Pit Pad Application and Construction The information contained in this document has been prepared to assist both Duke Energy personnel and Duke Energy customers in the application and construction of foundations for all 3-phase padmount transformers. # ducts transformer sizes space 75, 150, 300, 500 for 500, 750, 1000, 1500 4 pr!. No part of this web page may be reproduced in any way without the prior written permission of Duke Energy Corporation - Asset Recovery. 3-Phase Padmount Transformer Concrete Foundation - Duke Energy. PDF: Secondary-Bus-48x66x24.pdf. From small stabilizing pads to large transformer foundations, Oldcaslte Infrastructure equipment pads are durable and convenient foundations for your equipment needs. Overview From small stabilizing pads to large transformer foundations, Oldcastle Infrastructure equipment pads are durable and convenient foundations for your equipment needs. The thickness of all walls on the "pit pad" shall be a minimum of 5 - 1/2 thick. 3-Phase Padmount Transformer Concrete Foundation Specifications. Delivery available to several southern states: Florida, Georgia, North Carolina, South Carolina, Virginia, Alabama, Tennessee, Louisiana & Texas. endobj 0000011547 00000 n 2. Save big when you buy directly from the manufacturer. From small stabilizing pads to large transformer foundations, Oldcaslte Infrastructure equipment pads are durable and convenient foundations for your equipment needs. 01/18/2023 at 10:44 ET / ETR $107.32 0.41 Copyright West LLC. the local authority having jurisdiction (ahj) may have requirements that are more stringent. xref While browsing our products, select Add to Quote Generator to quickly get an estimate for everything you need. The North American Electric Reliability Corporation (NERC) standard and its companion SERC Reliability Corporation (SERC, which was formerly named the Southeast Electric Reliability Council) Supplement referenced above as Key References #1 and #2 require Entergy, as a Transmission Owner, to publish facility interconnection requirements. Often being constructed in less than a day, these pads are readily available for immediate installation without waiting for curing like pour-in-place alternatives. A Self-Application Statement: The material contained in the documents which are referenced, or linked, within thisdocument is consistent in content and application to those requirements used by Entergy Transmission for connecting Entergy and Entergy Affiliated new or modified generation, new or modified transmission, and new or modified end-user facilities. Our Transformer Pads are made of steel reinforced 5,000 psi concrete and are designed to support various standard size transformers as indicated by the dimensions on the drawings. Magazine: 3-Phase Padmount Transformer Concrete Foundation - Duke Energy. 0000016162 00000 n Full Construction Standards Division 00 - Procurement and Contracting Requirements Division 01 - General Requirements Division 02 - Existing Conditions Division 03 - Concrete Division 04 - Masonry Division 05 - Metals Division 06 - Wood, Plastics, and Composites Division 07 - Thermal and Moisture Protection Division 08 - Openings 0000011706 00000 n 0000012789 00000 n (ft) 7. Call us if you dont see what youre looking for, we make custom sized pads as well. Order Status Call for pricing. VG8~cVpH{#GIYSmj ,/({{ li?9}b&-l`K. If there are multiple transformers or secondary bus enclosures involved in the installation, there shall be a minimum clearance of 3 feet between all padmount equipment. Customer shall supply the concrete mix (as shown in the concrete mix specifications), welded wire fabric, #4 reinforcing bars, and shall pour the "flat pad" or "pit pad". Thank you for you inquiry! If you continue to use this site, you consent to the use of cookies. 56 0 obj positioning of transformer should be at least 1 ft. higher than pad mount transformer. Ft. Lauderdale, West Palm, Palm Beach, Miami, Naples, and Ft. Myers. 0000016556 00000 n Dimensions LxWxD inches. 12-26 Pad-mounted secondary cabinet (3 of 3) Spec. 57 0 obj Barrier must extend to the walls of the pit, from the top of the pad to the bottom of the pit and its top level must be level with the top of pad. Consider a LARGE pad in applications where the number of customer conduits/conductors exceeds the window opening restrictions of the SMALL pad, and when load growth and/or a transformer change-out to a larger size is anticipated. 3-Phase Padmount Transformer Concrete Foundation - Duke Energy. English Deutsch Franais Espaol Portugus Italiano Romn Nederlands Latina Dansk Svenska Norsk Magyar Bahasa Indonesia Trke Suomi Latvian Lithuanian esk . PADMOUNT EQUIPMENT INSTALLED AT INTERSECTIONS. If the building has an overhang, the distance is measured from the outside edge of the Get started Our Company We power the lives of our customers and the vitality of our communities. Refer to the Padmount Building Clearance Standard for the minimum allowable distance between transformer pads and buildings, building openings and equipment. A pad-mounted transformer is usually used to step the voltage down to 480/277 volts or 208/120 volts . . 0000017488 00000 n 0000016816 00000 n Bulk Discounts Available. Type II insulating mineral oil. <> Duke Energy 3-Phase Padmount Transformer Concrete Foundation Specifications July 2009 2. We use cookies to offer you a better browsing experience, analyze site traffic, personalize content, and serve targeted advertisements. Daytona, Ormond, Seminole County, Orange County, Flagler, Tallahassee, Jacksonville, Tampa, Miami, Clearwater, Melbourne, Cocoa, Florida Keys. o 11.09 Transformer-Rated Metering, Primary, Three-Phase o 11.11 Transformer-Rated Metering, Primary, Three-Phase - UG . Customer must be specific regarding 4-wire (grounded-wye) and 3-wire ("floatingwye") deliveries. 10 minimum from front of concrete.) There shall be a minimum clearance of 10' from the front of the concrete pad to any walls, machinery, or other obstacles. 0000016686 00000 n 0000016934 00000 n 0000005673 00000 n 11-2 Secondary connectors single-phase URD pad-mount transformer. Transformer Pad 40x45x4 Single Phase (25-167KVA), Transformer Pad 40x45x4 1 Phase (25-50KVA), Transformer Pad 52x44x4 1 Phase (75-250KVA), Transformer Pad 60 x 39 x 4 200A/600A SG Pad, Transformer Pad 75x60x7 3 Phase (75-500KVA), Transformer Pad 87x82x7 3 Phase (750-2500KVA), Transformer Pad 66 x 74 x 4 3 Phase URD Transformer, Transformer Pad 96 x 76 x 6 3 Phase URD Transformer, Transformer Pad 96 x 96 x 6 3 Phase URD Transformer, Transformer Pad 100 x 96 x 6 3 Phase URD transformer. Click on part number for drawing. 0000017009 00000 n With Duke Energy's Builder Portal, you have the tools you need to get it done, right at your fingertips. BROAD APPLICABILITY OF FAC-001-3 & THE SERC SUPPLEMENT REQUIREMENTS: The Generation reader should be aware that NERC Standard FAC-001-3 is applicable to both the FERC functional entity Transmission Owner and Applicable Generator Owner as written in section 4.1. From small stabilizing pads to large transformer foundations, Oldcaslte Infrastructure equipment pads are durable and convenient foundations for your equipment needs. Additional costs will incur for shipping and handling. 7. In most cases, regardless of the KVA rating, the air compartment of all currently purchased transformers should cover the entire window opening of either pad. Looking for a quote for your project? %%EOF Delayed 15 Minutes, System Planning and Requests for Proposals, https://www.nerc.com/pa/Stand/Reliability%20Standards/FAC-001-3.pdf, https://www.serc1.org/program-areas/standards-regional-criteria/regional-criteria-and-guidelines, Entergy Facilities Connection Spreadsheet, Interconnection and Operating Guides for Inverter Based Resources, Voltage level and MW and MVAR capacity or demand at POI, Voltage, Reactive Power and power factor control, Operational issues (abnormal frequency and voltages), Inspection requirements for existing or new Facilities, Communications and procedures during normal and emergency operating conditions. DUKE ENERGY Location of Mineral Oil-Filled Padmount Transformers Outdoors Near Buildings and Equipment Mecklenburg County - 1/29/2009 . Click on photo to view larger. Scholarship You have already flagged this document.Thank you, for helping us keep this platform clean.The editors will have a look at it as soon as possible. . If you continue to use this site, you consent to the use of cookies. PE0010U: NV Energy PADMOUNTED EQUIPMENT LOCATIONS & CLEARANCES . >> Click to make image larger. Duke Energy 3-Phase Padmount Transformer Concrete Foundation Specifications July 2009 1, Customer Responsibilities (continued) 4. Florida, Georgia, North Carolina, South Carolina, Virginia, Alabama, Tennessee, Louisiana & Texas. 3) Pit Pad Only 4) Cover bottom of pit with 6 of gravel. Products Entergy information sources regarding the topics listed below which are covered in subsection 2 are cataloged in the Excel document. Dimensions LxWxD inches. This information is intended to provide clear distinctions between the responsibilities of Duke Energy and of the customer. endobj Any size and location to fit your equipment needs. Duke Energy facilities or modifying existing Duke Energy facilities. Duke Energy Transformer Pads. 0 Listed below are instructions for building a transformer pad on site. 0000015853 00000 n Location . Customer Responsibilities The customer may choose to construct the transformer pad on site or purchase a prefabricated unit from a manufacturer. Entergy Transmission reserves the right to take such actions as deemed necessary to ensure the reliability of the interconnected transmission system. Customer is to contact Duke Energy to inspect pad forms and dimensions prior to concrete being poured 2. DEC-Enterprise Wide 02-Poles, Guys and Anchors Many of the standards in the following subsections are applicable: M-F 7:00-4:00. Location Available. 55 0 obj 0000017611 00000 n . 0000015649 00000 n 3-Phase Padmount Transformer Concrete Foundation - Duke Read more about transformer, concrete, padmount, secondary, specifications and conductors. We make concrete pads for Duke Energy Transformers and other various sizes. 52 0 obj PDF: 8285-FlatPad-Submittal.pdf. 9696-Pit-Box-Pad-1.pdf. We operate out of Eustis, FL. However, in all cases, it is critical to maintain an open dialog between Duke Energy and the customer regarding conductor quantities, conduit sizes and locations, connections, and electrical load requirements. xc```a``=wA Are you sure you want to delete your template? The "primary" conduit(s) and the customer's "secondary" conduits shall be cut to meet the dimensions as shown. See how we're building a smarter, cleaner, more reliable energy future. GE 37.5 KVA Dry Transformer - Never Used Catalog No. (Example: 500 MCM Copper, 600 volt insulated, four (4) conductors per phase.) endobj 0000008346 00000 n Downloads. 8=3b3@HWGp6aI" 6gFXFU#:gwc*0b4ARVA="b\!ieOy$tH,j@ Ivfg:u$ZE#*'J1[u'HIa0vWyN\)ieZBueG(@B_$`)>lUQ9@y'rzy&+GC)-1d2y7P#0)%Y>Z(*="l^[v(Ay, Our Transformer Pads are made of steel reinforced 5,000 psi concrete and are designed to support various standard size transformers as indicated by the dimensions on the drawings. Do Not Sell Or Share My Personal Information, Offers a simple rugged design for a strong foundation. News/Blog Location Available. 4905 Stough Road . HOW TO FOLLOW ENTERGYS COMPLIANCE WITH FAC-001-3 & THE SERC SUPPLEMENT THERETO Entergy has prepared this web site, a text document and a spreadsheet which fulfill the requirements of Key References #1 and #2. Pad-Mounted Transformers Optional Features & Accessories Broad selection of design efficiencies to meet specific customer applications and the new DOE efficiency requirements. In cases where there are 3 secondary conductors per phase or fewer AND the conductors are less than or equal to 400 MCM, a flat pad may be considered. Duke Small Transformer Pad 6682x6" Duke Large Transformer Pad 98104x6" Concrete Transformer Pads.